Bridge and Tunnel Club Blog Home
Bridge and Tunnel Club Blog

Fulton Street Station Passages Retained; MTA Board Members To Lose Headline-Grabbing Objections

The MTA decides to build a fully functional Fulton Street station and the public loses one of the more arcane debates over transportation infrastructure to come in some time:

It appears that subway riders can now look forward to both an architecturally ambitious station and an underground connection to the E train when the center opens in October 2009.

It also appears that the Metropolitan Transportation Authority is ready to spend some of its own money to make up the difference between the $847 million in federal funds that have been committed to the project and its current estimated cost of $888 million.

The transit center was originally proposed as part of the revival of Lower Manhattan after 9/11. It was to straighten out as much as possible the spaghetti plate of subway lines — A, C, E, J, M, Z, R, W, 2, 3, 4 and 5 — converging around Fulton Street. Many of these stations are currently connected, but the passageways between them are constricted and confusing.

At the heart of the center, at is was unveiled in 2004, was a new glass-clad entrance building, or headhouse, at Broadway and Fulton Street, topped by a glass dome not unlike a seashell in shape with a skylight that would scoop daylight down to the station below.

In the months and years since, the plan’s scope was repeatedly cut back because of budget constraints. Some changes, like the elimination of a subbasement, went unquestioned.

But in November, a minor revolt on the authority’s board greeted the proposed elimination of a passageway planned between the R and W lines and the E train terminus at the World Trade Center. Several members cast it as an either-or issue, pitting the form of the headhouse against the function of the passageway.

“We are not building cathedrals here,” said one board member, Nancy Shevell Blakeman.

Back at their drawing boards in recent weeks, the authority’s planners found that they could build a relatively inexpensive connector by using a corner of what is now the temporary PATH terminal rather than a route under Church Street.

Despite threats by board members to scuttle the dome, the plans were apparently never seriously in danger of being scaled back much further than they had already been.

See also: Between Simpler Transfer Or Fancy Roof, I Want The Roof!

Posted: January 8th, 2007 | Filed under: Architecture & Infrastructure
They Said “No More Inflatable Rats,” Not “No More Inflatable Cockroaches” »
« Underground Cell-Phone Reception Overtaken By Technology; Apparently All Of Those Unsightly Towers Are Actually Doing Something!

Recent Posts

  • “Friends And Allies Literally Roll Their Eyes When They Hear The New York City Mayor Is Trying To Go National Again”
  • You Don’t Achieve All Those Things Without Managing The Hell Out Of The Situation
  • “Less Than Six Months After Bill De Blasio Became Mayor Of New York City, A Campaign Donor Buttonholed Him At An Event In Manhattan”
  • Nothing Hamburger
  • On Cheap Symbolism

Categories

Bookmarks

  • 1010 WINS
  • 7online.com (WABC 7)
  • AM New York
  • Aramica
  • Bronx Times Reporter
  • Brooklyn Eagle
  • Brooklyn View
  • Canarsie Courier
  • Catholic New York
  • Chelsea Now
  • City Hall News
  • City Limits
  • Columbia Spectator
  • Courier-Life Publications
  • CW11 New York (WPIX 11)
  • Downtown Express
  • Gay City News
  • Gotham Gazette
  • Haitian Times
  • Highbridge Horizon
  • Inner City Press
  • Metro New York
  • Mount Hope Monitor
  • My 9 (WWOR 9)
  • MyFox New York (WNYW 5)
  • New York Amsterdam News
  • New York Beacon
  • New York Carib News
  • New York Daily News
  • New York Magazine
  • New York Observer
  • New York Post
  • New York Press
  • New York Sun
  • New York Times City Room
  • New Yorker
  • Newsday
  • Norwood News
  • NY1
  • NY1 In The Papers
  • Our Time Press
  • Pat’s Papers
  • Queens Chronicle
  • Queens Courier
  • Queens Gazette
  • Queens Ledger
  • Queens Tribune
  • Riverdale Press
  • SoHo Journal
  • Southeast Queens Press
  • Staten Island Advance
  • The Blue and White (Columbia)
  • The Brooklyn Paper
  • The Columbia Journalist
  • The Commentator (Yeshiva University)
  • The Excelsior (Brooklyn College)
  • The Graduate Voice (Baruch College)
  • The Greenwich Village Gazette
  • The Hunter Word
  • The Jewish Daily Forward
  • The Jewish Week
  • The Knight News (Queens College)
  • The New York Blade
  • The New York Times
  • The Pace Press
  • The Ticker (Baruch College)
  • The Torch (St. John’s University)
  • The Tribeca Trib
  • The Villager
  • The Wave of Long Island
  • Thirteen/WNET
  • ThriveNYC
  • Time Out New York
  • Times Ledger
  • Times Newsweekly of Queens and Brooklyn
  • Village Voice
  • Washington Square News
  • WCBS880
  • WCBSTV.com (WCBS 2)
  • WNBC 4
  • WNYC
  • Yeshiva University Observer

Archives

RSS Feed

  • Bridge and Tunnel Club Blog RSS Feed

@batclub

Tweets by @batclub

Contact

  • Back To Bridge and Tunnel Club Home
    info -at- bridgeandtunnelclub.com

BATC Main Page

  • Bridge and Tunnel Club

2025 | Bridge and Tunnel Club Blog