{"id":2079,"date":"2007-02-05T09:25:43","date_gmt":"2007-02-05T17:25:43","guid":{"rendered":"https:\/\/www.bridgeandtunnelclub.com\/wordpress\/archives\/2007\/02\/irish_need_not_parade.html"},"modified":"2008-01-24T14:09:02","modified_gmt":"2008-01-24T19:09:02","slug":"irish_need_not","status":"publish","type":"post","link":"https:\/\/www.bridgeandtunnelclub.com\/blog\/archives\/2007\/02\/irish_need_not.html","title":{"rendered":"Irish Need Not Parade"},"content":{"rendered":"<p>The MTA will keep the Irish out of Manhattan for St. Patrick&#8217;s Day as <a href=\"http:\/\/www.nydailynews.com\/news\/local\/story\/494336p-416418c.html\">the 7 train will be shut down for six consecutive weekends<\/a> starting this weekend:<\/p>\n<blockquote><p><em>Starting Feb. 10 and continuing for the following six weekends, the No. 7 will be largely shut down as Transit Authority crews do signal and track work, officials said.<\/p>\n<p>The first weekend there will be no trains between Times Square and Queensboro Plaza. After that, there will be no trains from 74th St.\/Broadway in Queens to Times Square.<\/p>\n<p>TA spokesman Paul Fleuranges said the work is part of the agency&#8217;s long-term plan for maintenance and upgrades, including replacing tracks, signals and rickety trains.<\/p>\n<p>&#8220;Without these investments, the system would not be near as reliable as it is today,&#8221; he said. &#8220;With this investment comes a price, and that is disruptions in normal service. For that we apologize.&#8221;<\/p>\n<p>Michael Murphy, 28, a public relations executive from Queens, couldn&#8217;t believe that TA would schedule such work for St. Patrick&#8217;s Day, which falls on a Saturday this year, when so many New Yorkers will be heading to the parade.<\/p>\n<p>&#8220;This is completely outrageous,&#8221; he said. &#8220;Many people will miss the parade because of the boneheads at the MTA.&#8221;<\/em><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>The MTA will keep the Irish out of Manhattan for St. Patrick&#8217;s Day as the 7 train will be shut down for six consecutive weekends starting this weekend: Starting Feb. 10 and continuing for the following six weekends, the No. 7 will be largely shut down as Transit Authority crews do signal and track work, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,3,55],"tags":[],"class_list":["post-2079","post","type-post","status-publish","format-standard","hentry","category-architecture_infrastructure","category-queens","category-thats_an_outrage"],"_links":{"self":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts\/2079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/comments?post=2079"}],"version-history":[{"count":0,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts\/2079\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/media?parent=2079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/categories?post=2079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/tags?post=2079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}