{"id":4641,"date":"2009-04-06T08:02:22","date_gmt":"2009-04-06T13:02:22","guid":{"rendered":"https:\/\/www.bridgeandtunnelclub.com\/blog\/?p=4641"},"modified":"2009-04-06T08:02:22","modified_gmt":"2009-04-06T13:02:22","slug":"the_secret_plan_to_drive_up_housing_prices_again","status":"publish","type":"post","link":"https:\/\/www.bridgeandtunnelclub.com\/blog\/archives\/2009\/04\/the_secret_plan_to_drive_up_housing_prices_again.html","title":{"rendered":"The Secret Plan To Drive Up Housing Prices Again"},"content":{"rendered":"<p>And while you&#8217;re at it, <a href=\"http:\/\/www.nydailynews.com\/ny_local\/2009\/04\/05\/2009-04-05_loss_of_mta_routes_would_isolate_4_neigh-1.html\">compare and contrast to the effects of eliminating the more media-friendly M8<\/a>:<\/p>\n<blockquote><p><em>Some bus riders would be stranded by bus cuts leaving them up to 2 miles from the nearest mass transit option, according to an MTA study. <\/p>\n<p>Residents in four areas on the city&#8217;s border face the longest treks if the Metropolitan Transportation Authority&#8217;s array of doomsday service cuts go into effect: the far West Side of Manhattan; Gerritsen Beach, Brooklyn; Woodlawn, the Bronx, and Oakwood Beach, Staten Island, according to an impact study done in connection with the authority&#8217;s planned service cuts. <\/p>\n<p>&#8220;It&#8217;s not right to leave us stranded,&#8221; said house cleaner Linda Girron, who works six days a week and lives at 49th St. and 11th Ave. &#8220;The bus is my only way of getting to work. We can&#8217;t get anywhere without the bus.&#8221; <\/p>\n<p>Since last year, transit officials have warned they&#8217;d have to make severe service cuts to fill massive budget gaps if the state doesn&#8217;t adopt a bailout. <\/p>\n<p>On the chopping block is weekend service on the crosstown M50 route used by Girron. Its demise would leave some workers and residents west of 11th Ave. a mile from mass transit, according to the study. <\/p>\n<p>Residents in Gerritsen Beach, a corner of Brooklyn near Sheepshead Bay, would fare worse during the wee hours of the morning. Some parts of the neighborhood would be nearly 2 miles from another bus route if the B31 is shut down as planned between 1:30 and 4:30 a.m. <\/p>\n<p>That&#8217;s bad news for late-shift workers like Alex Popov, 28, who works at a Times Square restaurant. He rides the B31 between 2 and 3 a.m. on his way home. &#8220;I need this bus,&#8221; Popov said.<\/p>\n<p>On the city&#8217;s northern border, Woodlawn residents may lose the Bx34, which runs along Katonah Ave., the heart of the neighborhood, connecting with the last stop on the No. 4 subway line. Some sections of Woodlawn would be left with &#8220;no transit service within a walkable distance&#8221; during some overnight hours, the study states.<\/em><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>And while you&#8217;re at it, compare and contrast to the effects of eliminating the more media-friendly M8: Some bus riders would be stranded by bus cuts leaving them up to 2 miles from the nearest mass transit option, according to an MTA study. Residents in four areas on the city&#8217;s border face the longest treks [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19,68],"tags":[],"class_list":["post-4641","post","type-post","status-publish","format-standard","hentry","category-class_war","category-follow_the_money"],"_links":{"self":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts\/4641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/comments?post=4641"}],"version-history":[{"count":1,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts\/4641\/revisions"}],"predecessor-version":[{"id":4642,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/posts\/4641\/revisions\/4642"}],"wp:attachment":[{"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/media?parent=4641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/categories?post=4641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bridgeandtunnelclub.com\/blog\/wp-json\/wp\/v2\/tags?post=4641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}